Two quotations arrive for the same machined bracket. One shows $34 a part; the other shows $46 a part. The cheaper quote is not automatically the cheaper project, and the expensive quote is not automatically overpriced — because the two shops may have planned two different ways of making the part.
The only honest comparison is line by line, on identical scope: the same drawing revision, material grade, quantities, tolerance scope, finish, inspection, and delivery terms. Until every quote answers the same question, the numbers cannot be ranked — only lined up and interrogated.
This guide walks through that line-up: what to demand before any quote, which lines to compare, the scope differences that quietly move the total, and a worked example that shows how the "expensive" quote can win.
Why the headline numbers cannot be compared
A CNC quotation is usually one number — a price per part — but that number hides a process plan. Xometry’s published cost guide lists the factors behind it: material selection, design complexity, machining time, machine tooling, volume and batch size, labor, overhead, and scrap and rework. Two shops quoting the same drawing can differ on almost every one of those factors, for entirely legitimate reasons:
- One shop planned the part on a 3-axis mill in three setups with two fixtures; the other planned it on a 5-axis centre in one setup. The second shop’s hourly rate is higher, but its cycle time is shorter and its datum error is smaller.
- One shop priced a standard aluminium bar; the other priced a plate, because the part is wide and flat and a bar would waste most of its volume as chips. CNC machining is subtractive: the quote covers the whole block, not just the finished part.
- One shop applied a general tolerance to every dimension; the other priced only the tight dimensions as tight, and left the rest at the general tolerance. The first quote is higher because it is promising precision the part does not need.
- One included anodizing and a CMM report; the other priced parts as-machined with a visual check, and will charge for finishing and inspection later.
None of that is visible in the headline. That is why the comparison starts before the quotes arrive, not after.
Step 1: make every supplier answer the same RFQ
A quote can only be compared with another quote if both were built from the same inputs. Before you send the RFQ, fix these in writing and send the same package to every supplier:
- Part files: a STEP file and a 2D drawing with the revision level, dimensions, tolerances, and surface finish. A quote built from a screenshot or a description is a guess, not a quote.
- Material: the exact grade and temper — 6061-T6 aluminium, 304 stainless, POM — and the stock form if it matters: bar, plate, or near-net blank. "Aluminium" is not a grade, and a bar and a plate of the same grade are priced differently because the waste differs.
- Quantities: the expected annual volume and the size of a typical order. Setup and programming are fixed costs spread across each batch, so a quote for 20 parts and a quote for 200 parts are different quotes even when the part is identical. Hubs’ published cost guide shows how steep that curve is: for the parts it measured, unit price roughly halves when the order grows from one to five parts, and falls five to ten times at volumes over 1,000 parts.
- Tolerances: which dimensions are critical, and to what tolerance — and which dimensions can stay at the general tolerance. Our guide to what tolerance to specify on CNC machined parts explains why a blanket tight tolerance is the most common avoidable cost on a drawing. Hubs’ guide makes the same point from the shop side: tight tolerances should be applied only where function requires them, and its standard tolerance is ±0.125 mm or better.
- Surface finish per face: the Ra target for each face, not one global note. A sealing face at Ra 0.8 µm and a general face at Ra 3.2 µm are different jobs; our guide to specifying surface finish on CNC machined parts shows the finishes side by side.
- Threads and holes: thread standard, size, and length; hole diameters in standard drill sizes where possible. Non-standard threads need special taps and gauges. Hubs’ guide recommends limiting thread length to three times the hole diameter, and notes that engagement beyond 1.5 times the diameter offers little additional joint strength.
- Inspection: what evidence you need — a first-article inspection report, a CMM report per batch, a material certificate — and whether it is 100% or sampling. A quote with no inspection line is not cheaper; it delivers less proof.
- Delivery terms and region: where the parts must arrive, packed how, and under which Incoterm. A price that excludes freight is not comparable with one that includes it.
If a supplier quotes without some of these, ask for a revised quote on the full package. Comparing a complete quote with an incomplete one is how the cheapest headline becomes the most expensive project.
Normalize the quantities first
Piece prices are quoted against quantities, and suppliers rarely assume the same ones. One quote may price 200 parts a year in orders of 200; another may price the same annual volume in orders of 20. The second supplier spreads ten times as many setups across the same number of parts, so its piece price is higher — and it is not more expensive, it is answering a different question.
Before you compare piece prices, confirm that every quote uses the same annual volume and the same typical order quantity, and ask each supplier to show the price at two or three quantity points — for example, 20, 200, and 1,000 parts. The price breaks reveal where the setup cost stops mattering and where material and cycle time take over, and they make the break-even calculation in the worked example below possible. A supplier that will only quote one quantity is asking you to decide on a single point of a curve.
The quote lines: what to compare
Ask every supplier to break the quote into lines, or at least to confirm in writing what is included. The lines that most often differ are:
| Quote line | What to check |
|---|---|
| Material | Grade, temper, and stock form named. Ask for the blank size: a part cut from a plate that is barely larger than the part wastes far less than one hogged out of an oversized block. Hubs’ rule of thumb is to select stock at least 3 mm larger than the finished part in all dimensions. |
| Programming (CAM) | Whether programming is a separate one-time line or buried in the unit price. Complex geometry needs more programming; a repeat order should not pay for it twice. |
| Setup and fixtures | Number of setups (orientations), and whether a dedicated fixture is needed. Each setup adds operator time, a first-article check, and a chance of datum error. Ask which machine the quote assumes — a 3-axis quote on a 5-axis part is the most common source of hidden cost. |
| Cycle time per part | Minutes of machining time per part, at the stated quantity, on the stated machine. Cycle time is usually the largest single cost line, so a quote without it is an estimate, not a quote. |
| Tolerance scope | Which dimensions are tight and which are general. A blanket tight tolerance on every dimension adds finishing passes and inspection time the part does not need. |
| Surface finish | Process and Ra target per face. "As machined" is a finish too — confirm which Ra it means. Multiple finishes on one part add masking and handling. |
| Threads | Thread standard and length. Hubs’ guide recommends limiting thread length to three times the hole diameter, noting that engagement beyond 1.5 times the diameter offers little additional joint strength; non-standard threads need special tooling. |
| Inspection | Report type and sampling plan: first-article report, CMM report per batch, material certificate, or visual check only. 100% CMM inspection on a large batch is real metrology time. |
| Secondary operations | Anodizing, plating, passivation, heat treatment, laser marking, deburring — included, outsourced, or excluded? Finishing is often outsourced, so confirm whether it is inside the quoted lead time. |
| Packaging | Bagging, boxing, labelling, and protection for the finish. Anodized faces need more protection than as-machined ones. |
| Freight and duty | Incoterm, who pays freight, and who handles customs. A price that excludes freight is not comparable with one that includes it. |
| Fixture or tooling ownership | Whether a dedicated fixture is a one-time charge, who owns it, and whether it is charged again on a reorder. |
| Price validity | How long the price holds, and what happens if material prices move. |
A supplier that refuses to break the quote down is not necessarily dishonest, but a lump sum gives you nothing to compare. At minimum, get the material grade and stock form, the setup count and machine type, the cycle time, the tolerance scope, the finish, and the inspection plan in writing.
For the background on what each of these lines pays for, see our CNC machining guide, which covers process, tolerances, and cost drivers, and our guide to designing CNC machined parts that cost less to make, which shows the design choices that move the number before any quote is written.
The five scope differences that quietly move the total
Even with matching lines, five scope differences routinely decide which quote is actually cheaper:
1. Machine choice and setup count. A part that needs three setups on a 3-axis mill can often be made in one setup on a 5-axis centre. The 5-axis hourly rate is higher, but one setup means one datum, one fixture, and one first-article check instead of three. Compare the number of setups and the machine, not just the hourly rate — a low rate with a slow process plan often costs more than a higher rate with a better plan.
2. Tolerance scope. Tightening a general tolerance from ±0.05 mm to ±0.005 mm can add a finishing pass, a temperature-stable measurement, and sometimes a second setup. If only two dimensions on the part actually need the tight band, a quote that prices all of them tight is pricing precision the part does not need. Ask which features carry the tight callout, and relax the rest to the general tolerance.
3. Finishing, outsourced or not. Anodizing, plating, and heat treatment are usually sent out. One quote may include them with the vendor’s price and lead time; another may exclude them and leave you to arrange finishing separately. The second quote looks cheaper until the finishing invoice arrives — and the finishing lead time is added to the delivery date.
4. Inspection depth. A dimensional report with every batch, a material certificate, and a first-article inspection are not paperwork for their own sake — they are the evidence that the parts match the drawing. If one supplier includes them and another does not, the second quote is cheaper only because it delivers less proof. Decide what evidence your project needs before you rank the quotes, not after the parts arrive.
5. Volume breaks and batch size. Setup and programming are fixed costs, so the unit price falls as the batch grows — and falls steeply at low volumes. A quote that wins at 200 parts may lose at 1,000, and the other way round. Always compare at your real planned volume, and ask both suppliers to re-price at your low and high volume cases before you decide.
Xometry’s cost guide makes the underlying point well: machining time, material, and volume interact, and short lead times, special tooling, and extra processes all push the price up. Hubs’ design guide says the same thing from the design side: most of the cost is decided by geometry, stock size, and tolerance callouts before the spindle turns. If the quotes differ wildly, the first question is usually whether the drawings they were priced from were the same. See Xometry’s CNC machining cost guide and Hubs’ guide to reducing CNC machining costs for the same cost factors from two large US manufacturing platforms.
A worked example: when the expensive quote wins
The comparison only becomes real when it is run over your planned volume. The example below is illustrative, with stated assumptions — it is not a quotation, and real prices depend on the part, the material, and the supplier.
Suppose two quotes for the same aluminium bracket, both on the same RFQ package:
- Quote A: setup $600, unit price $34. The plan is a 3-axis mill in three setups, bar stock, as-machined finish, visual inspection only. Anodizing ($8 a part) and a CMM report ($400 per 200-part batch) are excluded.
- Quote B: setup $1,500, unit price $41. The plan is a 5-axis centre in one setup, plate stock, anodizing included, CMM report with every batch included.
The true cost per part is not the headline. For Quote A, the excluded lines add $8 a part for anodizing plus $400 per 200-part batch for the CMM report, which is $2 a part. So Quote A’s true total for q parts is:
$600 + ($34 + $8 + $2) × q = $600 + $44q
Quote B’s total is:
$1,500 + $41 × q = $1,500 + $41q
At 200 parts:
- Quote A total: $600 + (200 × $44) = $600 + $8,800 = $9,400.
- Quote B total: $1,500 + (200 × $41) = $1,500 + $8,200 = $9,700.
At 200 parts, Quote A is cheaper by $300 — and it buys three setups, three datum risks, and an outsourced finishing step you have to manage. The break-even volume — the point where the two quotes cost the same — is:
($1,500 − $600) ÷ ($44 − $41) = $900 ÷ $3 = 300 parts.
Below 300 parts, Quote A is cheaper. Above it, Quote B is cheaper. At 1,000 parts, Quote A totals $600 + $44,000 = $44,600, while Quote B totals $1,500 + $41,000 = $42,500 — Quote B is cheaper by $2,100, and it also delivers the single-setup datum accuracy and the included inspection that Quote A charges separately.
That is the whole comparison in one number: it depends on your volume, not on the headline. If your real annual volume is 150 parts, Quote A wins on cost — and you should still ask what the missing anodizing and inspection will cost you when you need them. If your volume is 1,000, Quote B wins and the question is already settled. Run the same arithmetic on your own quotes, with your own volumes, and add the lines each quote excludes — finishing, inspection, fixtures, and freight — before you rank them.
Red flags in a quotation
A quote deserves a second look — and a written question back to the supplier — when you see any of these:
- No material grade or stock form named. "Aluminium" or "steel" without a grade and temper means the supplier chose the material, not you.
- No machine type or setup count. Without these, the cycle time is a number without a process plan behind it.
- No cycle time per part. A price per part with no machining time behind it is an estimate, not a quote.
- One blanket tolerance on every dimension. A drawing with ±0.005 mm everywhere is either overpriced or unachievable; ask which features are actually tight.
- No inspection line at all. A quote that promises a certificate verbally, with no report type or sampling plan, has not priced inspection.
- Finishing listed as "surface treatment" with no detail. Anodizing, plating, and passivation are different processes with different prices and lead times.
- Setup charged per part. Setup is a one-time cost; spreading it across the batch is the supplier’s job, and a per-part setup charge hides the batch-size effect.
- A unit price far below every other quote. Sometimes it is a better process plan. Sometimes it is a missing line — material, finishing, inspection, or freight — that will appear later as an extra charge. Ask which lines are missing before you assume it is a bargain.
Quote-comparison checklist
Use this checklist on every quotation before you rank it. A "no" or "not stated" is not a rejection — it is a question to send back.
- Same STEP file and 2D drawing revision used by every supplier
- Material grade, temper, and stock form named
- Annual volume and typical order quantity stated
- Machine type and number of setups stated
- Cycle time per part stated, at the stated quantity
- Programming cost stated, and not charged twice on a reorder
- Tight tolerances flagged per feature; the rest at general tolerance
- Surface finish stated per face, with Ra target
- Thread standard, size, and length stated
- Inspection scope stated: first-article report, CMM report, material certificate, sampling plan
- Secondary operations listed as included, outsourced, or excluded
- Fixture cost stated as one-time, with ownership stated
- Packaging specification stated
- Minimum order quantity and setup charge stated
- Delivery terms (Incoterm), freight, and destination stated
- Price validity period stated
- Payment stages tied to milestones stated
- Total cost calculated at your real planned volume, including the lines each quote excludes
- Price shown at two or three quantity points, so the break-even volume is visible
- Supplier’s answers to the differing lines in writing, so the quote can be held to them
Frequently asked questions
Should I always choose the lowest total cost?
Not automatically. The lowest total on paper can still be the wrong choice if it buys three setups where one would hold the datum better, no included inspection evidence, or a finishing step you must arrange yourself. Rank quotes by total cost at your real volume first, then check whether the cheapest one still meets your quality, timing, and risk requirements. If it does not, the next-cheapest quote that does is the better buy. Our guide to ordering a CNC sample before volume production explains what evidence to require before the volume order is released.
How many quotations should I compare?
Three comparable quotes are usually enough to see the range and to spot an outlier. More than five adds comparison work without adding information, unless the quotes keep disagreeing on scope — in that case the problem is the RFQ package, not the number of suppliers.
What if two quotes are close and I still cannot decide?
Ask both suppliers the same written questions about the lines that differ, and compare their answers. A supplier that answers precisely — machine type, setup count, cycle time, tolerance scope, inspection plan — is giving you a quote you can hold them to. Also check the practical points: sample approval evidence, first-article inspection, and how changes are handled. Our FAQs answer the common questions on quoting, trials, and quality.
Can I negotiate a quote down?
You can ask a supplier to re-price a defined scope — a looser tolerance on a non-critical face, a standard finish instead of a polished one, a larger batch — but asking for a lower number on the same scope usually removes something. Ask what changes if the price changes, and get the revised scope in writing.
Send the same package, then compare the lines
A CNC quotation is not a price. It is a price for a defined process plan, and the process plan is where the money hides. Send every supplier the same RFQ package, demand the same lines, and run the total at your real volume before you rank anything.
If you are ready to request a quotation, send your STEP file, 2D drawing, material, quantities, key tolerances, surface finish, delivery region, and timing through our contact page. A complete package gets you a comparable quote — and a comparable quote is the only kind worth ranking.